The following list and links provide information that may be required for your project.

Note: Cutting of trees or use of dynamite on County lands will not be permitted. Strathcona County does not allow seismic surveying on County roads or in County roads rights-of-ways.

 Strathcona County Protocol

  • Notification and consultation – Notification request may be beyond AER requirements.  The following letter provides an example of notification – sample notification letter and accompanying fact sheet
  • School bus information
  • Water well testing

Utilities

  • Locate contact for County infrastructure 780-467-7785

Roads

  • ROWCAP (required) Please indicate if using seismic lines across County roads in winter.
  • RUA
  • Access approach 
    • Below is a list of things that should be included on the drawings attached with an approach application.
    • PDF format
    • Directional arrow- North
    • All roads labeled with civic and legal address
    • Dimensions for access and distance from closest intersection
    • Proposed access to be highlighted
  • Specialized Municipality Order in Council

Environment

  • Low impact seismic methods
  • Vegetation removal plan
  • Re-vegetation plan
  • Notification to Elk Island National Park (if within a Legal Land Section distance)
  • Migratory Bird Act and Owl Survey

Agriculture

Emergency Services

Thank you.  A copy of this list will be provided with our response. Please refer to links provided for requests, standards and applications.

Related topics

Last updated: Thursday, May 08, 2025
Page ID: 50089