Range Road 233 Design: Ash Street to Highway 628

In 2006 Council approved the design project for Range Road 233 from Ash Street to Highway 628. In the ensuing time period, the Sherwood Golf & Country Club Estates (Stage 1) and Balmoral Heights neighbourhoods were developed, and the first roundabout was introduced. Land acquisition has been proceeding along the Range Road 233 corridor.     

The current design work includes safe and efficient intersection treatments—such as road widening and roundabouts at residential subdivisions—as well as a multi-use trail system. Short term improvements will include further road widening and the construction of a roundabout at the intersection of Fountain Creek Way and the future Greenside Drive (Stage 2 of Sherwood Golf & Country Club Estates). 

A summary report (787.9 KB) was presented to Council on January 22, 2013.


Attachments:  

Project map (200.7 KB)
Council report February 21, 2012 (668.1 KB)
Functional Planning Report Range Road 231, 232 and 233 (2004) (102.2 MB)

Please check the CountyWorks webpage for future updates.

FAQ

  • 1. Will walking trails be constructed along Range Roads 231, 232 and 233?

    We are currently evaluating the long-term needs of these areas as a part of our Functional Planning Study, and will be deciding about walking trails from the results of that study.

Transportation Planning and Engineering
780-464-8279
transportationplanningandengineering@strathcona.ca

Last updated: Friday, September 21, 2018
Page ID: 50322