Range Road 210 upgrades

Range Road 210

Range Road 210 is planned to be upgraded between Township Road 550 and Highway 15 in order to improve the safety and sustainability of the roadway. It is proposed to be upgraded to a modified Class II roadway to better support the current level of traffic volume.

The upgrades will include: 

  • Widening the current 6-6.5 m roadway to a 7.5 m roadway
  • Improving the roadway to an asphalt surface
  • Providing gentler ditch side slopes, where possible

Proposed typical cross-section upgrades (1.0 MB)

Project timeline

This project is currently in the design phase.

Design phase

This section of road is planned to be constructed into a modified Class II roadway once land agreements, utility agreements, and regulatory approvals have been completed.

Timeline

January 2020: start of roadway design

Project contacts:

Consultant:
Joseph Luca, Project Manager
Al-Terra Engineering Ltd.
780-577-4313
JLuca@al-terra.com

County Connect

Ask a question, provide feedback or report an issue.

Related pages

Last updated: Thursday, November 05, 2020
Page ID: 50832